Swiss Rolex replica
TheJaquet Droz Grande Seconde SW isn't an brand-new view - as we evaluated this Swiss Rolex replica here -- but also for 2017, it will acquire some slight visible improvements.
The Manor House - Phase 4 | Llama Architects

Llama Architects

Llama Architects Manor House Phase 4
Janey Butler Interiors Manor Hse 4
Bridgnorth 46
Janey Butler Interiors Manor Hse 1
Janey Butler Interiors Manor House phase 4
Janey Butler Interiors Manor Hse 26
Janey Butler Interiors Manor Hse 7
Janey Butler Interiors Manor Hse 11
Janey Butler Interiors Manor Hse 8
Janey Butler Interiors Manor Hse 2
Janey Butler Interiors joinery detail
IMG 7489
Janey Butler Interiors Joinery
Janey Butler Interiors Manor Hse 18 edit
Janey Butler Interiors Manor Hse 16 edit
Janey Butler Interiors Manor Hse 22
Janey Butler Interiors Manor Hse 25 edit
Janey Butler Interiors Manor House phases 4
Janey Butler Interiors Manor Hse 14
Janey Butler Interiors Manor Hse 29
Janey Butler Interiors Manor Hse 5
Janey Butler Interiors Manor Hse 31
E9 FEA56 E FAFD 4 EB3 BE84 B3874 CB29803
Janey Butler Interiors Manor Hse 27
Janey Butler Interiors Shower Room 1
Janey Butler Interiors Shower Room 3
Janey Butler Interiors shower room 2
Janey Butler Interiors Shower Room 4

Location: Shropshire

Project Type:

Awards:

  • Best Integrated Home Level 1 Cedia Awards 2020

The Manor House - Phase 4

This was a very large country Manor House that we were asked to completely redesign internally, extend the existing ground floor, install a comprehensive M&E package that included, new boilers, underfloor heating, AC, alarm, cctv and fully integrated Crestron AV System which allows a central control for the complex M&E and security systems.

Phase IV involved the 5 en-suite bedrooms of the house spread over the 1st and 2nd floor of this large house. Audio and video distribution was installed in all bedrooms, controlled through a Crestron system with lighting via Lutron. A mixture of underfloor heating in the tiled bathrooms and new, colour matched traditional radiators in all carpeted areas were installed and fed via the new Plant Room in Phase III.

Large format tiles, all hand mitred with Vola fittings throughout were fitted in all bathrooms . Hand-made dressing rooms were designed/installed to all the bedrooms, whilst individual and different for each room, all collectively designed to be harmonious together also. Finally all rooms/landings etc were redecorated, re-carpeted and fully redesigned and fitted out with bespoke furniture, lighting and window treatments.

Get in touch

www.luxywigs.com